Product DescriptionLuxury Vinyl Tile, PVC FlooringProduct: LVT
(Loose Lay, Dry Back, LVT Click), SPC Click , WPC ClickColor: Wood
Design/Stone DesignPackage: PalletizedMOQ : 1000m²/ColorPayment
Terms: 30% T/T deposit. 70% T/T against copy of B/L or LC at
sightLead Time: 30~45 days(1) LVT Dry BackSize:
6''x36'', 9''x48'', 12''x24'', 18''x18'', etc.Thickness: 2mm,
2.5mm, 3mm Wearlayer: 0.1mm~0.7mm(2) LVT
Loose Lay(Anti-slip Backing, Sticky Backing)
Size: 18''x36'', 9''x48'', 18''x18'', etc.
Thickness: 4mm, 5mm Wearlayer:
0.3mm~0.7mm(3) LVT Click Size:
180x1210mm,220x1210mm,304.8x609.6mm, etc.
Thickness: 4mm, 4.5mm, 5mm Wearlayer:
0.3mm~0.5mm Available for length
1.5m/1.8m (4) SPC Click
Size: 172x1210mm, 218x1210mm, 300x600mm, etc.
Thickness: 4mm, 4.5mm, 5mm Wearlayer:
0.15mm~0.5mm Available for length
1.5m/1.8m Specially for Residential
Use (5) WPC Click Size:
180x1210mm, 220x1210mm etc. Thickness: 5.5mm,
6mm, 6.5mm, 7mm Wearlayer:
0.3mm~0.5mm Available for length
1.5m/1.8mDetailed Photos CertificationsCE, ASTM, Floorscore,
ISO9001, BSCI......Packaging & ShippingInstallation
InstructionsLaying instructions- CLICK
SYSTEM General:Then execution of
floor-covering work is construction work within the terms of the
German Construction Contract Procedures (VOB). The VOB Part C DIN
18365 "Flooring Work" thus provides the basis for the execution of
flooring work and the laying of flooring.Before choosing the
appropriate floor covering it is always necessary to know the
on-site type of use and existing sub-floor in order to select the
right and proper flooring. Only in this way can added value and
value maintenance throughout the planned lifetime of the floor
covering be guaranteed.Sub-floor:The sub-floor must be even, clean,
sufficiently dry, free of dust and cracks, and sufficiently
load-bearing. It is always necessary to prime mineral sub-floors so
that no dust is present on the existing sub-floor. Before carrying
out the flooring work an evaluation of the sub-floor in accordance
with DIN 18365 "Flooring Work" is necessary. As design flooring are
vapor-proof coverings, residual moisture in the sub-floor is
particularly significant. It is to be demonstrated that appropriate
measurements have been taken. With existing underfloor heating
there should be an appropriate heating protocol to ensure the
sub-floor is ready for the installation of the
flooring.Installation:•Checking the floor coveringOur CLICK-design
flooring undergo a strict quality control procedure that guarantees
high-quality standards. If, contrary to all expectations, material
problems should be identified on site, there are to be notified
before cutting to size and laying. Claims for obvious defects (e.g.
Color variations, differences in thickness, surface defects,
insufficient accuracy of fit etc.) cannot be accepted after
laying.If a number of packages of design flooring are being used
the contents should be checked for batch-to-batch variation before
cutting and laying. When ordering it is imperative that reference
be made the need for a consistent color-matched delivery with no
batch variation.•Interior climatic conditionsThe floor covering
must be adapt to the room temperature before laying. This requires
at least 24 hours acclimation. For installation the room air
temperature must not be less than 18ºC and temperature of the
sub-floor not less than 15ºC. The relative humidity should not
exceed 75%. With underfloor heating floor temperatures of between
18ºC and 22ºC are o be observed.In the winter months the underfloor
heating should be kept at a low temperature for at least 72 hours
before the floor covering is laid, during laying, and for at least
hours after laying (see surface temperatures). Rapid or distinct
changes in temperature can cause gaps or warping in the
flooring.These climatic conditions are to be maintained for at
least 48 hours before laying the flooring, during installation, and
also for at least 72 hours after the flooring has been completed.
Larger changes in room temperature are to be undertaken gradually
in accordance with the usual room climate conditions.•Laying the
floor coveringPriming is always recommended on mineral sub-floor in
order to bind dust and particle matter and thus to prevent noise
being generated when the flooring is in use..Before laying the
CLICK-design flooring the room is to be measured and assessed in
terms of laying direction and starting point.We recommend the use
of our Click-Underlay, which not only has a noise-mitigating and
heat-insulating effect but also compensates for slight sub-floor
irregularities and impurities without adverse consequences.The use
of Click-Underlay is imperative with the following sub-floors:
parquet, laminate, ceramic tiles (with joints of max. 5mm width and
2mm depth), PVC-flooring and flat stone floors. The "sticky"
surface significantly reduces vertical movement to the sub-floor.
The underlay is used tra
Related products about Wood Design Spc WPC PVC Floor Tile Vinyl Flooring
- Waste Tyre Plastic Recycling Machinery Machine Tire Crusher Production Line Rubber Crumb Grinding Machine Equipment Tire Shredder
- Stretch Plastic Blowing Pet Bottle Making Blow Molding Machine Bottles Stretch Automatic Pet Bottle Blowing Machine
- Waste Plastic Pet Bottle, Water Bottle Flake, PP/HDPE/LDPE PE Film Jumbo Woven Bags Plastic Crusher Machine, Plastic Crushing Washing Recycling Machine
- Type 2 Wall-Mounted Electric Car Charging Station 7kw /11 Kwelectric Vehicle Charging Station Home Wallbox AC EV Charger Single Phase or 3three Phase
- G-View G12W Wholesale Auto Car LED Headlight Bulb High Power H13 H11 9005 H7 H4 Car LED Headlights LED Car Lights
- New Design Porcelain Round Plates Dinner Set for Wedding and Banquet
- China 2023 New Design Super Soft 100% Polyester Microfiber Knitted Oversized Decoration Hoodie Blanket
- Handmade Art Creative Materials Thickened White Paper Cup DIY Disposable Handmade Colored Paper Cup