Equipment details:Product NameGypsum Powder Production line Annual
capacity15,000 to 500,000 tonsWorking time 24h/day ,300day/year Raw
Material Gypsum TypeNatural gypsum mineral or chemical gypsumGypsum
powder MeshWithin 220 meshesHeating method Hot
air boiling furnace or rotary kiln Application of the powder
Building material like to produce gypsum board , To make plaster of
paris , to make gypsum cornice or ceiling Degree of automationFully
automaticFinal product specificationGypsum powderFuel for the
heating system natural gas,coal,diesel,heavy oil,light oil
etcPacking method available packing machine 1-2 mouthRotary kiln
packing machine 1ton bag packing machine Finished powder
bending strength 2.7Mpa Finished powder compressive
strength5Mpa Crushing systemThe crushing system can crush
large ore from mine mining to an average granularity of 25 mm by
one time, is an ideal version of traditional ways of two and three
stage crushing Cacination systemCalcination
system is the key link in the production and processing of
gypsum powder, and it is also the most difficult part to master.
According to this situation, we have developed a new generation of
gypsum powder suitable for various application - a
new type of hot air boiling furnace Features of this hot air
boiling furnace technology1-Reduce investment2-Reduce maintenance
cost3-Gypsum powder quality adjustable4-The installation period is
short and area is small5-energy and power saving Milling
systemThe mill system will make the gypsum particles into gypsum
powder,through the combined action of analysis machine and fan,
this mill can meet the fineness of grinding requirements from
different users Storage systemCalcination system is the
key link in the production and processing of gypsum powder, and it
is also the most difficult part to master. According to this
situation, we have developed a new generation of gypsum powder
suitable for various application - a new type of
hot air boiling furnaceWhy choose Yurui ? 1,Continuous
production: adopt soft starter,to make sure the continuous
and stable production .2, stable quality: adopt latest hot air
boiling furnace technology and cooling system , improve the quality
of the product.3, energy-saving and stable: core technology cooling
system and waste heat utilization system.4, equipment performance
is high : adopt bag dust collector, frequency converter , PLC
Mitsubishi and the national standard cable5, the control is sample
: use computer display, PLC control.6. installation and
commissioning period is short ,within 3-7 days Cases for your
reference: We have a customer in Indonesia who own 3
factories.He bought 4 sets gypsum powder line and 4 sets gypsum
board line from 2008 yeas to 2018 yearIn 2008 year: gypsum powder
line 50000 tons/year + gypsum board line 8000000 sqm/yearIn 2009
year:gypsum powder line 150000 tons/year + gypsum board line
10000000 sqm /yearIn 2012 year:gypsum powder line 150000
tons/year + gypsum board line 10000000 sqm /yearIn 2018
year:gypsum powder line 300000 tons/year + gypsum board line
20000000 sqm /yearThis large and long investment involves
small,middle and large capacity.The largest capacity even exceed
local enterprise KNAUF.All the total 8 production lines are running
well now.Chemical gypsum powder&POP projectThis is
our chemical gypsum powder project in South Africa. The customer is
a well-known local building material supplier. The owner has been
in the phosphogypsum industry for more than 40 years.project
capacity: Gypsum powder line: 50000
tons/year Plaster of Paris line: 30000ton
/year 1-Project name:Natural gypsum powder&board
project2-Project capacity: Gypsum powder
line:150000ton Gypsum board line : 10Million
sqm/year 3-Project technology:hot air
technology For this project, our Chief engineer has only
taken 5 days to run the whole gypsum powder production line and put
it into production after installation, and our customer also felt
surprised on it. While some manufacturers need more than one month
to finish it or even some are unable to run it for
production. We have been deeply engaged in
the field since 1998, setting up 100+gypsum projects domestic and
abroad. Our engineers group who only serve for YURUI left a full
footprint over Africa, Asia, and south America, total of
20+countries. We hold different projects in each area, offering
case visiting on-site. /* March 10, 2023 17:59:20
*/!function(){function s(e,r){var
a,o={};try{e&&e.split(",").forEach(function(e,t){e&&(a=e.match(/(.*?):(.*)$/))&&1
Related products about Gypsum Plaster Powder Making Machine Production Line Equipment
- Waste Tyre Plastic Recycling Machinery Machine Tire Crusher Production Line Rubber Crumb Grinding Machine Equipment Tire Shredder
- Stretch Plastic Blowing Pet Bottle Making Blow Molding Machine Bottles Stretch Automatic Pet Bottle Blowing Machine
- Waste Plastic Pet Bottle, Water Bottle Flake, PP/HDPE/LDPE PE Film Jumbo Woven Bags Plastic Crusher Machine, Plastic Crushing Washing Recycling Machine
- Type 2 Wall-Mounted Electric Car Charging Station 7kw /11 Kwelectric Vehicle Charging Station Home Wallbox AC EV Charger Single Phase or 3three Phase
- G-View G12W Wholesale Auto Car LED Headlight Bulb High Power H13 H11 9005 H7 H4 Car LED Headlights LED Car Lights
- New Design Porcelain Round Plates Dinner Set for Wedding and Banquet
- China 2023 New Design Super Soft 100% Polyester Microfiber Knitted Oversized Decoration Hoodie Blanket
- Handmade Art Creative Materials Thickened White Paper Cup DIY Disposable Handmade Colored Paper Cup