>>> Product Features1. The impeller adopts particular
large channel structure, so the drain capacity has been improved
greatly, it can be effectively pass the solid grain whose diameter
is about 50% of the pump caliber. 2. Mechanical seal adopts the
latest material and is made with extra care, so its life is over
8000 hours. 3. It can adopt double-way and automatic coupling
installation device which makes the installation, maintenance of
the unit convenient and quick. 4. To realize automation management
we will equip various forms sewage special control cabinet
according to the customer's requirements. >>> Product
Supply ScopePump, packing and specification. Pump automatic
coupling installation device, soft pipe, automatic controllers etc
can be probided as accessories (accessories shall be valued
separaely). >>> Product Application1. Living waste water
discharging 2. Sewage system of municipal works 3. Sewage system in
factory and mine corporation 4. Temporary floodwater discharging 5.
Waste water discharging of public facility 6. Various
water-discharging system >>> Product Model
Meaning80WQ50-10-3 NoNameMeaning180Outlet diameter2WQSubmersible
sewage pump350Capacity410Head53Motor Power>>> Use, Check
and Service1. Precaution at use1), It is not proper to use the pump
in a medium environment easy to explode and burn and to extract any
inflammable liquid. 2), It is strictly prohibited to impact or
press the cable and use it as a lifting rope, and pull it at when
the pump is running so as not to damage it, which may result in an
electric shock, or lowering the cable seainess, or the insulation
performance of the wiring box of the motor. 3), When to use the way
of fixed automatic coupling installation, lift or lower down the
pump with the lifting chains locking the handle and take care to
handle it. 4), The pump has to be vertically lifted when it is
placed in water and not horizontally landed, further more, not sunk
into sludge. 5), A flow regulating valve must be equipped with the
spitting pipeline to avoid overload of the motor due to a too heavy
flow. 2. Check before use 1), Carefully check if there is any
deformation or damage with the pump and any looseness fall-off with
the fasteners during transport, storage and installation. 2), Check
if any damage or fracture with the cable, if the seal on its inlet
intact and make a proper treatment in time if any possible leakage
or bad seal is found. 3), Measure the insulation resistance between
the phases and between the phases and ground with a 500v megohm 2
meter, the value of which has not to be lower than megohm,
otherwise a drying treatment must be taken for the stator winding
of the motor with a temperature not over 120 degrees or notify the
manufacture for help. 4), Check if there is oil in the oil chamber
and do not stop filling it until it over flows on the filter check
if the screw cork and sealing pad on the oil chamber are full and
if the screm cork and presses the sealing pad on tight. 5), Check
if the impeller rotates flexibly. 6), Check if the power device
safe, reliable or normal and if the grounding wire inside of the
cable reliably grounded. 7), Before placing the pump in the pool,
check if it is in a correct, direction of rotation by way of dot
moving and cut off the power and change the U, V, W three wires
with any two of which in the electric control cabinet if not
correct. 3. StartingClose the flow regulating valve on the spitting
pipeline at starting and gradually open it when the pump gets in
the full speed running. Note the pump can not run for a long time
with the valve closed. 4. StoppingLift the pump, clean it and place
it in a dry place when intended not to use it up to half a month
and lift it out of the water and let the liquid in side of it drain
out to prevent it from being frozen when the temperature is very
low. 5. Periodically check the insulation resistance between phases
and between phases and ground, otherwise it has to be removed to
overhaul, and, at the same time, check if the grounding is secured
and reliable.1), Replace the seal ring with a new one when the max,
interval of it, mounted on the impeller neck and pump casing, is
over 2mm. 2), After half a year running of the pump under the
provided working medium condition, check the state of oil chamber
and replace it with N10 mechanical oil fit shows emulsified state.
It is possible that the mechanical seal on the pump, side is made
damaged when the leakage probe-gives a warning with the pump
running for as short time after the oil replacement and replace it
at once. More often check the pump when it is used under a very
adverse working condition. 3), After one year work of the pump
under the normal working condition, abiggover haul must be taken
for replacing the worn-out parts, checking the fasteners, at the
same time, menting or replacing the grease on the bearing so as to
ensure a good lubrication of the pump during its running. 4), To
disassemble. do not knock as is
Related products about Wq Submersible Sewage Pump The Liquid Temperature No More Than 60 Degrees
- Waste Tyre Plastic Recycling Machinery Machine Tire Crusher Production Line Rubber Crumb Grinding Machine Equipment Tire Shredder
- Stretch Plastic Blowing Pet Bottle Making Blow Molding Machine Bottles Stretch Automatic Pet Bottle Blowing Machine
- Waste Plastic Pet Bottle, Water Bottle Flake, PP/HDPE/LDPE PE Film Jumbo Woven Bags Plastic Crusher Machine, Plastic Crushing Washing Recycling Machine
- Type 2 Wall-Mounted Electric Car Charging Station 7kw /11 Kwelectric Vehicle Charging Station Home Wallbox AC EV Charger Single Phase or 3three Phase
- G-View G12W Wholesale Auto Car LED Headlight Bulb High Power H13 H11 9005 H7 H4 Car LED Headlights LED Car Lights
- New Design Porcelain Round Plates Dinner Set for Wedding and Banquet
- China 2023 New Design Super Soft 100% Polyester Microfiber Knitted Oversized Decoration Hoodie Blanket
- Handmade Art Creative Materials Thickened White Paper Cup DIY Disposable Handmade Colored Paper Cup