Heat Pump Air to Water Converter with Europe Energy
LabelsProjectUnitR134a UnitsR22 UnitsEnvironmental sideDry bulb
temperatureºC -35-21ºC -35-21ºCUse side Water
outlet temperatureºC 35-70ºC 35-55ºCWater flowm3/hRated
Flow±15%Rated Flow±15%Allowable voltage rangeVRated voltage±5%Rated
voltage±5%Three-phase voltage imbalance rate/±2%±2% Allowable
frequency rangeHZRated frequency±2%Rated frequency±2%Note if water
outlet temperature is higher than
70ºC ModelKMAD-100KMAT-150KMAT-200KMAT-240KMAT-280KMAT-330The
refrigerantR134aHeatingKW100150200240280330Input power(rated
condition)KW38557085100113power supply 3φ-380V-50HZprotective
deviceReverse phase loss protection, over current protection,motor
temperature protection, high and low voltage protection,high and
low temperature protection, water flow protectionRefrigeration
circuit1Energy control (%)0,50,75,100Refrigerant charge
(kg)100150160180200220Finned heat exchangerCopper tube wearing
hydrophilic corrugated aluminum sheetFanFormAxial FlowFlow
(m3/h)60000600009000090000120000120000Power (kw)66991212Water side
maximum pressure MPaFormShell and tube heat exchangerWater side
maximum pressure MPa1 Import and export pipe
diameterDN65DN80DN100DN100DN125DN125Hot water
flow17.225.834.441.34956.8Water pressure drop384245485255Running
noisedB(A)757778808182Unit length(mm)336033605000500060006000Unit
width(mm)226022602230223022302230Unit
height(mm)250025002500250025002500Unit
weight(kg)400043006400670081008500Running
weight(kg)4500480070007300870092001. According to GB/T
25127.1-2010, the nominal heating standard: ambient dry bulb
temperature -12°C,ambient wet bulb temperature -14°C, hot water
outlet temperature 41°C, water flow 0.172 m3 / h * kW;2, The
ambient temperature range: -25 ° C ~ 21 ° C; Tot water temperature
range: 35°C ~ 70°C;3. The unit parameters are subject to change
without prior notice. The specific parameters are subject to the
product nameplate;4. KMAD-100 unit is a heating and cooling unit,
GB/T 25127.1-2010 national standard nominal cooling capacity
is5. ★ for the upcoming product
model. ModelKMAT-130A*KMAT-190A*KMAT-290A*KMAT-350AKMAT-350AVThe
refrigerantR22HeatingKW130190290350350Input power(rated
condition)KW456598118120power supply 3φ-380V-50HZprotective
deviceReverse phase loss protection, over current protection,motor
temperature protection, high and low voltage protection,high and
low temperature protection, water flow protectionRefrigeration
circuit1Energy control (%)0,50,75,100Refrigerant charge
(kg)160180200220220Finned heat exchangerCopper tube wearing
hydrophilic corrugated aluminum sheetFanFormAxial FlowFlow
(m3/h)6000090000120000120000120000Power (kw)69121212Water side
maximum pressure MPaFormShell and tube heat exchangerWater side
maximum pressure MPa1 Import and export pipe
diameterDN80DN100DN125DN125DN125Hot water
flow22.432.74960.260.2Water pressure drop4548525555Running
noisedB(A)8080828585Unit length(mm)35005000600060006000Unit
width(mm)22302230223022302230Unit
height(mm)25002500250025002500Unit
weight(kg)45006200800085008500Running
weight(kg)500067008700900090001. According to GB/T 25127.1-2010,
the nominal heating standard: ambient dry bulb temperature
-12°C,ambient wet bulb temperature -14°C, hot water outlet
temperature 41°C, water flow 0.172 m3/h*kW;2. The ambient
temperature range: -35°C ~21°C; Tot water temperature range: 35°C
~55°C;3. The unit parameters are subject to change without prior
notice. The specific parameters are subject to the product
nameplate.4. ★ for the upcoming product
model. FAQQ1: Are you factory or trade company?
A1: We are factory.Q2: What the exactly address of
your
factory? A2:Our company is located in No. 6767, Tingfeng Rd. Jinshan District, Shanghai 201502, ChinaAnd our factory is located in No.
366, YangzhuangBang Street, Pingxing Rd., Xindai Town, Pinghu,
Zhejiang Province, China. Q3: Warranty terms of your
machine? A3: Two years warranty for the machine and
technical support according to your needs.Q4: Will you provide
some spare parts of the machines? A4: Yes, of
course.Q5: How long will you take to arrange
production? A5: 380V 50HZ we can delivery the goods
within 10 days. Other electricity or other color we will delivery
within 22 daysQ6: Can you accept OEM
orders? A6: Yes, with professional design team, OEM orders are highly welcome.
Related products about New Energy Swimming Pool Inverter Split Air to Water Heat Pump
- Waste Tyre Plastic Recycling Machinery Machine Tire Crusher Production Line Rubber Crumb Grinding Machine Equipment Tire Shredder
- Stretch Plastic Blowing Pet Bottle Making Blow Molding Machine Bottles Stretch Automatic Pet Bottle Blowing Machine
- Waste Plastic Pet Bottle, Water Bottle Flake, PP/HDPE/LDPE PE Film Jumbo Woven Bags Plastic Crusher Machine, Plastic Crushing Washing Recycling Machine
- Type 2 Wall-Mounted Electric Car Charging Station 7kw /11 Kwelectric Vehicle Charging Station Home Wallbox AC EV Charger Single Phase or 3three Phase
- G-View G12W Wholesale Auto Car LED Headlight Bulb High Power H13 H11 9005 H7 H4 Car LED Headlights LED Car Lights
- New Design Porcelain Round Plates Dinner Set for Wedding and Banquet
- China 2023 New Design Super Soft 100% Polyester Microfiber Knitted Oversized Decoration Hoodie Blanket
- Handmade Art Creative Materials Thickened White Paper Cup DIY Disposable Handmade Colored Paper Cup